Press "Enter" to skip to content

Scrap Collector | LA Hard Hats


back on the job site worker ondrea’s
gecas is focused on a more immediate
problem trash evo will generate over
5,000 tons of trash collecting it is the
job of the trash hauler Ramon do you
have a copy 20 coming out where the guys
that come in here really get this place
in the shade and get it looking good so
it’s livable someone’s got to do it so I
just take the initiative and do it what
about this stuff here can I get this for
the most part now I’ve learned to see
what trash with what they might reuse
and if I don’t know I usually find the
forming of a different trade and ask
them is can I throw this out it’s okay i
try to get permission from somebody
before you do that just in case I’m you
don’t want to step on any toes to
achieve certification from the US Green
Building Council 75% of this trash needs
to do recycle
some of it like scrap wood is sorted on
site
the rest of it will go to a diversion
center where any recyclable material
will be sorted out
six months before the deadline Evo is
hit with a painful setback a rare la
rainstorm hits during the weekend
water leaked through open holes on the
unfinished top deck and ran down through
the building into units that had already
been finished you look at the drywall
down here it’s coming out right
underneath here hey Bill Jerry hey I’m
in 1208 in the bathroom there’s a water
coming out of the electrical outlet and
I just let you know I’m gonna need some
help a group from I sec the cabinet and
finishing contractor arrived to inspect
the damage is that soaking up the lead
here that’s definitely wet here yeah
howard s right said that it’s because
they don’t have to list on the building
yet and the water is literally running
down eeks boy mdf just Oh smells up this
does this Lee here have anything to do
with being a man live room because I
wanted if the exterior skin they weren’t
able to complete it because of the man
left here that there’s some relationship
between the leak the exterior skin that
being sealed off and the man life I
think it is this will have to be
replaced it says yes it’s not like we
can salvage a section and you know my
mold issues and all that stuff it’s all
gonna carpenter Darrell Slater
works into the night to replace
floorboard that he installed just a few
weeks earlier I’ve been this whole
freaking building every room I’m sick of
it I’ve done the whole building every
room and I’m going crazy this sucker is
mdf it’s medium density fiberboard and
sometimes little because of the weather
the moisture it will Bend up it’ll move
it’ll keep it ain’t painted Craig but
it’ll even come off the wall it’ll be
filled with moisture and water and it
really Rex it blows it up we’re really
reckless we’ll come back and replace
what’s messed up
suz water gets in there and it cuz of
the rain here last week yeah I guess
there’s a room down on them four or five
that got flooded and all the cabinets
and all the bearings got to be replaced
the flooring everything is over the rain
it leaked in through somewhere and just
totally messed up w me huh
Please follow and like us: